Sign In
We'll never share your email with anyone else.
Reset Password

Enter your email address and we'll send you a link to reset your password.

Back to Sign In
This Old House

This Old House - Season 36 Episode 16 Lexington Project 2015: Part 8: Conservation Concerns

A covered gutter is installed; the infiltration system to disperse water from gutters into the ground is detailed; native plants that will return part of the lawn back to nature are discussed; and how existing aluminum wiring is being worked with while updating recessed light fixtures and installing sconces over the mantel. Also: the making and testing of two types of windows for the project.

Download List server

Similar Movies

Recomendation Movies