Or
Enter your email address and we'll send you a link to reset your password.
To view this video please enable JavaScript, and consider upgrading to the latest web browser
A lally column stands in the way of the new open floor plan. As a solution, it is removed, and the ridge beam is replaced with a trio of engineered beams. The new landscape is previewed in 3D, and tips are shared for creating an accessible bathroom.
Our movie and video library can only be streamed or downloaded by members only